Key points in this article
The technical baseline
On technology maturity, source-grid-load-storage has passed the stage of pure validation. Know the site conditions first. The question is no longer whether it can be done, but how to do it more economically and stably, with a clear cost structure and easier use as what ordinary users should watch.
Real constraints in rollout
The prospect is good, yet constraints are real. Rolling out source-grid-load-storage meets practical issues of cost, standards linkage, and coordination mechanisms. Facing constraints honestly is how we dissolve them, and the focus shifts by stage across Yantai varied districts rather than by one fixed measure. Coordinate with existing systems.
Our view at Dongshang New Energy
As practitioners, our stance on source-grid-load-storage is optimistic for the long term and pragmatic in the short term. Yantai Dongshang New Energy keeps following solar-storage-charging, putting locally suitable practices steadily on the ground. Mind cost and standards linkage. Pace matters more than speed; we verify first, expand next, iterate always.